Avaliações de risco em barragens: estudo de caso da barragem malcozinhado no nordeste brasileiro

Autores

  • Mariana Campos Fontenelle Universidade de Fortaleza (UNIFOR), Fortaleza, Ceará, Brasil, marianacfontenelle@gmail.com
  • Alexandre de Sousa Fontenelle Ministério da Integração Nacional, Brasília, Distrito Federal, Brasil, alexandre.fontenelle.mi@gmail.com
  • Yago Machado Pereira de Matos Universidade Federal do Ceará (UFC), Fortaleza, Ceará, Brasil, yago_mpm@hotmail.com
  • Fernando Feitosa Monteiro Universidade de Brasília (UnB), Brasília, Distrito Federal, Brasil, engffmonteiro@gmail.com

DOI:

https://doi.org/10.5216/reec.v14i1.46356

Resumo

O presente trabalho tem a proposta de avaliar a eficácia de duas metodologias de avaliação de risco de uma barragem no Nordeste Brasileiro no intervalo de 10 anos, baseando-se na inspeção e no nível de ameaça. Utiliza-se a metodologia Nível de Perigo da Barragem (NPB) para cálculo do nível de ameaça (Fontenelle, 2007) e para o cálculo do risco as metodologias da Companhia de Gestão dos Recursos Hídricos do Ceará (COGERH) e do Conselho Nacional de Recursos Hídricos (CNRH). Observa-se que o crescente número de barragens soma-se a preocupação com a segurança destas. Face a isto, utiliza-se a avaliação de risco como forma de priorizar ações de manutenção e recuperação. O estudo de caso ocorreu na Barragem Malcozinhado, localizada no município de Cascavel, no estado do Ceará. Com base na inspeção, calcula-se o nível de ameaça e o risco, compara-se estes com os resultados de 2006. Assim, observou-se o aumento no nível de ameaça, no entanto, o risco permaneceu, em geral, baixo, semelhante aos resultados de 2006. Este resultado se deve ao fato de que o número de anomalias aumentou, porém trata-se de uma barragem jovem, de pequeno porte e inspecionada regularmente.

Abstract

The present study has the proposal of evaluating the effectiveness of two methodologies of risk Assessment of a Brazilian Northeast dam in a range of 10 years, based on the inspection and the level of hazard. The methodology used for calculating the hazard level is the Dam Hazard Level (NPB). In addiction, in order to evaluate the risk is used the methodology of the Water Resources Management Company of Ceará (COGERH) and the methodology of National Resources Council Water (CNRH). The number of dams is increasing with to the concern for their safety. In view of this, risk assessment is used as a tool to prioritizing maintenance and recovery actions. The case study occurred in the Malcozinhado Dam, located in the municipality of Cascavel, in the state of Ceará. Based on the inspection, the level of hazard and risk is calculated, compared to the results for 2006. Thus, the increase in the level of hazard was observed, but the risk remained generally low, similar to 2006 result. This result is due to the fact that the number of anomalies has increased, but it is a young, small and regularly inspected dam.

Downloads

Não há dados estatísticos.

Biografia do Autor

Mariana Campos Fontenelle, Universidade de Fortaleza (UNIFOR), Fortaleza, Ceará, Brasil, marianacfontenelle@gmail.com

Alexandre de Sousa Fontenelle, Ministério da Integração Nacional, Brasília, Distrito Federal, Brasil, alexandre.fontenelle.mi@gmail.com

Yago Machado Pereira de Matos, Universidade Federal do Ceará (UFC), Fortaleza, Ceará, Brasil, yago_mpm@hotmail.com

Fernando Feitosa Monteiro, Universidade de Brasília (UnB), Brasília, Distrito Federal, Brasil, engffmonteiro@gmail.com

Downloads

Publicado

2017-08-28

Como Citar

CAMPOS FONTENELLE, M. .; DE SOUSA FONTENELLE, A. .; MACHADO PEREIRA DE MATOS, Y. .; FEITOSA MONTEIRO, F. . Avaliações de risco em barragens: estudo de caso da barragem malcozinhado no nordeste brasileiro. REEC - Revista Eletrônica de Engenharia Civil, Goiânia, v. 14, n. 1, 2017. DOI: 10.5216/reec.v14i1.46356. Disponível em: https://revistas.ufg.br/reec/article/view/46356. Acesso em: 19 nov. 2024.

Edição

Seção

Geotecnia